logo-home

StudySmart

Helping students not just improving grades but also to provide better learning of subject concepts and its problem statements. I am providing you world class assistance which may help you to excel in course or assignments.

Community

  • Followers
  • Following

1799 items

Package deal for CSLB B License General Contractor Exam with Latest Questions and Answers

(0)
$14.49
0x  sold

CSLB Concrete C8 License Practice Test 2 with Questions and Answers CSLB Concrete C8 License Practice Test 3 with Questions and Answers CSLB Concrete C8 License Practice Test 1 with Questions and Answers CSLB Contractor's Law Practice Test Part 2 with Questions and Answers CSLB Law & Business Exam with Questions and Answers CSLB Contractor's Law &

i x
  • Package deal
  •  • 7 items • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
i x

CSLB B License General Contractor Exam with Latest Questions and Answers

(0)
$7.99
0x  sold

CSLB B License General Contractor Exam with Latest Questions and Answers How many board feet are in a 5"D x 6"W x 20'L beam? ANSWER 50 board feet. Thickness X Width X Length in Inches dived by 144. Soldering of a copper pipe fitting is completed when: ANSWER Solder appears all around the joint. What is the maximum spacing of single nails in a single layer of drywall on the ceiling? ANSWER 7" is the maximum spacing of single nails in a single layer of a drywall ceiling. In cons...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 50 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Concrete C8 License Practice Test 2 with Questions and Answers

(0)
$7.99
0x  sold

CSLB Concrete C8 License Practice Test 2 with Questions and Answers The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. ANSWER 1/3 Which of the following tests for concrete is conducted at the site/field? ANSWER Color Test Explanation: Rest of the above are laboratory tests. If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days and is able to accept the concrete if it attains...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 15 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Concrete C8 License Practice Test 3 with Questions and Answers

(0)
$7.99
0x  sold

CSLB Concrete C8 License Practice Test 3 with Questions and Answers The slope of the side gutter from the edge of the shoulder to the bottom of the gutter, shall NOT be more than_________. ANSWER 6:1 If the temperature during the concrete repair/restoration works is below________ ͨ F, warm water needs to be used. ANSWER 50, Explanation: Additionally insulation covers are also required. In columns where multiple layers of reinforcement steel is required to be arranged in groups, the...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 12 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Concrete C8 License Practice Test 1 with Questions and Answers

(0)
$7.99
0x  sold

CSLB Concrete C8 License Practice Test 1 with Questions and Answers What is the volume of a cylinder if the diameter equals 3 feet and the length equals to 12 feet? ANSWER 84.78 cubic feet Explanation: There are two ways to solve the problem. However, regardless of which method is used, you need to first determine the area of the circle then multiply it by the length.Traditional MethodUse the following formula:Area of the circle = π x r x rWhere π = 3.14 and radius (r) = 1.5 feet (half ...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 17 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Contractor's Law Practice Test Part 2 with Questions and Answers

(0)
$7.99
0x  sold

CSLB Contractor's Law Practice Test Part 2 with Questions and Answers Which of the following is NOT true concerning a joint-control addendum to a contract? A. It prevents the contractor from being paid more than the value of the work completed B. It safeguards the consumer's property from liens by requiring contractor's to supply lien releases C. It analyzes the contract, plans, breakdown of costs and prepares an account from which funds will be disbursed D. It is controlled by the...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 16 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Law & Business Exam with Questions and Answers

(0)
$7.99
0x  sold

CSLB Law & Business Exam with Questions and Answers When must a lawsuit be filed to complete a Stop Notice? ANSWER After 10 days, but within 90 days of the date the stop notice was given. A technique used by businesses to compare the actual expenses of a project to the estimated expenses in the bid. ANSWER Cost control The largest cost allocation in a job is... ANSWER Labor When both parties (owner and contractor) give something of value or performance to the other. Ex. The client gi...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 18 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

CSLB Contractor's Law & Business Exam with Questions and Answers

(0)
$7.99
0x  sold

CSLB Contractor's Law & Business Exam with Questions and Answers How often are you required to pay sales tax? ANSWER It depends on the expected amount of taxable sales. How long does a client have to cancel a contract for repairs that are the result of an event for which a State of Emergency was declared? ANSWER In a state of emergency, a client has 7 business days to cancel a contract for repairs. All of the following are causes for disciplinary action except: A. Allowing your lice...

i x
  •  Package deal
  • Exam (elaborations)
  •  • 37 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

California C10 Electrical Exam with Questions and Answers

(0)
$7.99
0x  sold

California C10 Electrical Exam with Questions and Answers Min receptacles in a garage ANSWER 1 Mobile home service equipment shall be line of sight and no more than ____ from the exterior wall of the home ANSWER 30' If a service conductor is over 300V but less than 600V, what is the minimum clearance of that service conductor if it runs in residential and commercial areas that are not subject to traffic? ANSWER 15' A power meter must be a minimum of ____ feet away from any door, ga...

i x
  • Exam (elaborations)
  •  • 4 pages • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
Quick View
i x

Package deal for Medical Microbiology Test with Questions and Answers

(0)
$17.99
0x  sold

Medical Microbiology Study Guide with Questions and Answers Medical Microbiology- Exam 1 (Chapter 1-3) with Questions and Answers Medical Microbiology Exam 2 with Questions and Answers Medical Microbiology, Chapter 11 Exam with Questions and Answers Medical Microbiology Exam 3 with Questions and Answers Final Exam multiple choice Medical Microbiolo

i x
  • Package deal
  •  • 9 items • 
  • by wangithiannaw • 
  • uploaded  01-06-2024
i x